The Brief

Albion was appointed to install a new mezzanine floor at Warner Bros in Watford, providing additional usable space within the facility.

The project gave Albion the opportunity to work within the film and production industry and contribute to a high-profile production environment.

  • ClientWarner Bros
  • LocationWatford
  • Project Value£150k
  • Duration4 weeks
  • Albion Workforce8 employees

The Challenge

The project was located in Watford, requiring Albion’s team to travel from South Wales to deliver the installation.

Combined with the short four-week programme, careful planning and coordination were essential to ensure the project could be completed within the required timeframe.

Our Approach

Albion supplied and installed:

  • Mezzanine floor
  • Staircase
  • Handrailing
  • Pallet gate
  • Fire protection

The complete installation was delivered within a four-week programme.

The Result

The project was successfully completed within four weeks, providing Warner Bros with the additional mezzanine space required.