Albion was appointed to install a new mezzanine floor at Warner Bros in Watford, providing additional usable space within the facility.
The project gave Albion the opportunity to work within the film and production industry and contribute to a high-profile production environment.
- Client
- Location
- Project Value
- Duration
- Albion Workforce
The Challenge
The project was located in Watford, requiring Albion’s team to travel from South Wales to deliver the installation.
Combined with the short four-week programme, careful planning and coordination were essential to ensure the project could be completed within the required timeframe.

Our Approach
Albion supplied and installed:
- Mezzanine floor
- Staircase
- Handrailing
- Pallet gate
- Fire protection
The complete installation was delivered within a four-week programme.

The Result
The project was successfully completed within four weeks, providing Warner Bros with the additional mezzanine space required.